사업소개
교량탑재 Marine Bridge Construction Home > Services > 교량탑재

교량탑재 (Bridges Loading)


·  Installed top side of GeoGeum bridge (Goheung-gun Geogeumdo - Sorokdo)
·  Installed island-connecting bridge for Nohwa-Soan of Wando Island (500TON F/C)

선유교(무녀도-선유도) 운송, 탑재 by 3,000ton F/C (2016.02~03)


·  Seonyugyo transportation, installation of main section of bridge
    (shallow water and shallow water depth)